case studies

Brisbane Airport Link Road Project

Remedial recently completed fire rating work to the Brisbane Airport Link Road Project
Read case study

Pharmalab Clean Room Facilities - Epoxy Floor

Parmalab in NSW recently required installation of a new Epoxy Floor system in their Clean Room Facilities
Read case study

Doltone House - Commercial Kitchen Floor

A new epoxy flooring surface was recently completed at Doltone House Sydney
Read case study

Fire Rating to the pressed metal roof of the Brisbane Town hall Internal application of passive Fire rating productsHeritage Building restoration including brick repointing and structural repair

Penrith Panthers Stadium - Fire Rating

Earlier this year, Remedial was contracted to perform Fire Rating to the structural steel on the new wing at Penrith Stadium

read more

Asbestos removal, waterproofing and heritage works-Education Building Sydney

In 2006, Remedial Building Services completed membrane works on the Education Building in Sydney

read more

Certified Fire Doors Can Save Lives

Fire doors are an integral component of passive fire rating safety. Minimising the spread of flame and ensuring occupants a greater chance of safety. In this blog we discuss possible signs your doors may need replacing and why a structurally sound door is so vital.