case studies
Penrith Panthers Stadium - Fire Rating
Earlier this year, Remedial was contracted to perform Fire Rating to the structural steel on the new wing at Penrith Stadium
Read case study
Asbestos removal, waterproofing and heritage works-Education Building Sydney
In 2006, Remedial Building Services completed membrane works on the Education Building in Sydney
Read case study
Manly Beach - Structural Repair and Facade Refurbishment
Remedial was contracted to perform structural repair and facade refurbubishment. The result was quite stunning.
Read case study
Taronga Zoo - Toilet Floors
Taronga Zoo contracted Remedial Building Services to apply a seemless, non-slip floor in their toilet block
Read case study
CSIRO - Laboratory Epoxy Floor
Remedial Building Services were contracted to supply and install a 2-3mm Self Levelling Non-Slip Epoxy Floor.
Read case study
Westmead Children's Hospital - Fire Rated Walkway
Westmead Children's Hospital constructed a series of covered walkways which they realised needed to be fire rated to protect the structure
Read case study
Sydney Airport: T2- Fire Rating
Remedial were recently awarded the fire rating contract for the T2 passenger terminal
Read case study
Symbion - Pharmaceutical Floor
The Queensland flooring team completed some pharmaceutical grade floors for Symbion. The result was one everyone was pleased with
Read case study
Drink Manufacturer - Protective Flooring Surface
Remedial recently completed work on the floor of a drink Manufacturer
Read case study
Carbon Fibre Strengthening - Eagle St-Brisbane
Carbon Fibre was recently applied to the underside of a concrete deck to increase its load baring capacity
Read case study
Structural repair to St Lukes Church
St Lukes recently underwent structural repair to the bell tower and waterproofing to the roof deck
Read case study
Shark Park, Cronulla - Passive fire protection
Remedial recently applied fire protection for the steel used in the construction of the new stadium at Cronulla
Read case study
Residential Apartment Fire Rating Solution
RBSA were recently selected by Watpac Australia to provide a fire rating system with an FRL of 60 minutes
Read case study
Doltone House - Commercial Kitchen Floor
A new epoxy flooring surface was recently completed at Doltone House Sydney
Read case study
Pax Australia - Epoxy Floor Upgrade
Pax Australia recently upgraded elements of their operations, including the rectification of their flooring surface
Read case study
Randwick TAFE- Epoxy Floor Resurfacing
Randwick Tafe and Sustainability centre appointed Remedial to apply an epoxy surface to their high traffic areas
Read case study
WSN Environmental Solutions - Flooring Solution
WSN Environmental Solutions required a flooring upgrade to their treatment plant in Sydney's Eastern Creek
Read case study
Fire Rating- Brisbane City Hall
ABI Group, the project managers for the restoration of Brisbane City Hall appointed Remedial Building Services to create a fire rating package which would provide fire rating protection and solid insulation properties
Read case study
Casella Winery - Epoxy Floor Surfacing
In 2011 Remedial was contracted to resurface over 4500m of the Casella Winery and over 350 lineal meters of coving at the Casella Winery in NSW
Read case study
Mooloolaba Underwater World - Concrete Repair Services
Mooloolaba Underwater World recently appointed us to remove all existing elements of the aquatic environments, fix identified structural issues and then rebuild the underwater environment to the designs supplied
Read case study
Restaurant Momofuku - Epoxy Floor in Kitchen
Recently opened Momofuku restaurant in Sydney's Star contracted Remedial Building Services to install a robust epoxy floor in the kitchen
Read case study